top of page

Program: Infrastructure Engineering and Management

Name of Student

TITLE

Status

 1. Nisha Belbase       

Retrofitting measures to achieve the original strength of buildings by analyzing structural parameters

Running

2. Birendra Tiwari              

Optimal location of shear wall in the vertical irregular buildings.

Running

 3. Lalbabu Yadav          

Seismic vulnerability assessment of historic structure: A case study of Birtamati Temple and Surya Temple, Birgunj.

Running

 4. Bibek Chandra Das                 

Seismic Performance Evaluation of Non-Engineered RC School Building Before

and After Retrofitting.

Completed

(April 2023)

 5. Samundra Pokhrel                 

Seismic Performance Evaluation of RC Framed Building with Soft Storey 

Completed

(March 2022)

 6. Jyoti Shah        

Performance of RC Frame Building With and Without Shear Wall Based on Linear and Non-Linear Static Analysis

Completed 

(Sep 2021)

 7. Sagun Gora

Seismic Analysis of RC-Masonry Hybrid Residential Building  

Completed

(Sep 2021)

 8. Sujan Mishra                  

Shear capacity and shear reinforcement of exterior beam-column joint of RC building.

Completed

(March 2021)

 9. Saugat Tiwari                  

Comprehensive seismic performance assessment of low rise RC building of Pokhara valley.           

Completed

(August 2020)

 10. Subhash Chhetri  

Comparative study on the effect of soft storey on infill RC buildings resting on sloping ground under seismic effects.

Completed

(May 2019)

 11. Sudip Prakash                       Timilsena  

Comparative study of strength and physical properties of concrete by using partial recycled aggregate and natural bed aggregate.

Completed

(May 2019)

 12. Niroj Dahal 

Performance based analysis of R.C. building consisting varying soft storey level.

Completed

(Nov 2018)

 13. Yubaraj Panthee

Experimental study on recycled concrete aggregate as partial replacement of coarse aggregate for new construction: A case study of partial use of recycled aggregate in Pokhara valley.

Completed

(Oct 2017)

  • s-facebook
  • Twitter Metallic
  • s-linkedin
bottom of page